Development of ICT Turnkey Solution (Test Program + Fixture) stable and reliable.

SAVE YOUR TIME WHEN INTRODUCING YOUR IN-CIRCUIT TEST PROCESS AND DURING THE WHOLE PRODUCTION PROCESS.

If you identify any of these issues in your test applications, we can support you with developing reliable ICT tests. Talk to one of our engineers, and we will advise you on improving your electrical testing.

Have you detected these problems in your ICT process?

Multiple down times

False

You DEBUG "N" times the same test

The test did not detect the absent component

Attention to your equipment after office hours

Unstable tests

Damage to your equipment cards randomly

Parallel projects with the best lead time

A specialized engineering team with the largest capacity and infrastructure in the region.

The Fixture Vendor of your Choice

We work with the fixture house of your choice.

STATISTICAL ANALYSIS OF YOUR TESTS

We deliver MSA studies, stress tests, and mechanical interference, among others, to ensure its operation.

Your introduction in hours not days

Six Sigma level debugging (6σ).

Prevent a potential equipment damage

Standard discharge routines and additional hardware.

SOLUTIONS

In-Line and Off-Line Fixtures

x1149 application development

LED tester integrations

Flash Programming Integrations

Training

Cobot integrations

Customized test integrations

OUR PARTNERS

LET’S MAKE A PLAN

1

Please send us your CAD files and test strategy

Please share the information so we can generate a perfect plan based on your needs.

2

Let's have a meeting

Here we will review the details and scope of our proposal for you, ensuring we reach your goals.

3

Obtain stable ICT Tests

Eliminate false and downtimes by debugging a program with a six sigma level. With optimized test time and the test coverage that you need.

ICT tests are often unstable; sometimes, they pass and sometimes fail. We deliver a test program application and adapter in a stable, accurate, and reliable way, backing it up with an external study that guarantees its stability to save downtime in your ICT process.

Enter your data to access the content